1 | English French Notes Complete/Exclude
|
---|
2 | entry was
|
---|
3 | entries were
|
---|
4 | Updating EQUIPMENT INV. file
|
---|
5 | Someone else is editing this entry.
|
---|
6 | #PM REFERENCE
|
---|
7 | PMI Procedure(s)
|
---|
8 | There is no defined PM schedule for this Equipment Category.
|
---|
9 | Equipment Category:
|
---|
10 | Lockout Required?:
|
---|
11 | JCAHO Item:
|
---|
12 | There is no defined PM schedule for this piece of equipment.
|
---|
13 | Equipment ID #:
|
---|
14 | Local ID:
|
---|
15 | Lockout Required?
|
---|
16 | Equip Category (cont'd):
|
---|
17 | Entry Number (cont'd):
|
---|
18 | Tech:
|
---|
19 | Starting Month:
|
---|
20 | Skip Months:
|
---|
21 | Criticality:
|
---|
22 | Frequency (multiple):
|
---|
23 | TRI-ANNUAL
|
---|
24 | BI-ANNUAL
|
---|
25 | BI-MONTHLY
|
---|
26 | BI-WEEKLY
|
---|
27 | Proc Ref:
|
---|
28 | Starting Year:
|
---|
29 | RECORD EQUIPMENT PREVENTIVE MAINTENANCE INSPECTIONS
|
---|
30 | Should PM work orders be deleted after close out? YES//
|
---|
31 | Please enter first PM work order to be closed:
|
---|
32 | This work order has already been closed out and posted. If you wish to change
|
---|
33 | the data, please use the EDIT WORK ORDER option.
|
---|
34 | Next work order (or sequential portion), '^' to quit:
|
---|
35 | <cr> to continue, '^' to quit...
|
---|
36 | Work Order
|
---|
37 | Would you like to edit it
|
---|
38 | Would you like to generate a regular work order
|
---|
39 | IN PROGRESS
|
---|
40 | Failed PMI
|
---|
41 | Select Worklist Month:
|
---|
42 | Date of worklist must contain a month.
|
---|
43 | MONTHLY or WEEKLY PM List: MONTHLY//
|
---|
44 | Which week?
|
---|
45 | Enter a number, 1 to 5.
|
---|
46 | COMPLETION DATE (future dates will not be accepted). MONTH and YEAR are
|
---|
47 | required, DAY is optional:
|
---|
48 | Completion date must contain a month.
|
---|
49 | Do you wish to substitute one technician for another
|
---|
50 | If all of the work assigned to TECHNICIAN A has actually been done by
|
---|
51 | TECHNICIAN B then you should enter 'YES' at this point and then 'Replace'
|
---|
52 | TECHNICIAN A 'With' TECHNICIAN B.
|
---|
53 | Work orders without a technician already assigned should be closed indivi-
|
---|
54 | dually. You'll have a chance to do this before Rapid Close Out begins.
|
---|
55 | Replace:
|
---|
56 | With:
|
---|
57 | This option will scan the
|
---|
58 | PM Worklist of the
|
---|
59 | . It will automatically assign a PM Status of 'PASSED'
|
---|
60 | and a completion date of
|
---|
61 | to each work order on the list,
|
---|
62 | except for those that you close out individually.
|
---|
63 | Default values for labor and material costs (if any) from the Equipment File
|
---|
64 | will be posted to the Equipment History during Rapid Close Out.
|
---|
65 | The PRIMARY TECHNICIANS will be changed as follows:
|
---|
66 | will be changed to
|
---|
67 | Are you sure you want to proceed
|
---|
68 | Another user is processing this worklist. Please try again later.
|
---|
69 | There are no open work orders on this list. Nothing to process.
|
---|
70 | Please enter any PM work orders (or the sequential portion thereof) that you
|
---|
71 | wish to close out individually. Press <RETURN> to terminate the process.
|
---|
72 | Work order (ex: '
|
---|
73 | ' or just '
|
---|
74 | Already closed.
|
---|
75 | Next work order (or sequential portion), <RETURN> to quit:
|
---|
76 | is already closed.
|
---|
77 | A MONTHLY PMI list contains work orders for ANNUAL, SEMI-ANNUAL, QUARTERLY,
|
---|
78 | BI-MONTHLY, and MONTHLY preventive maintenance inspections.
|
---|
79 | A WEEKLY PMI list is for WEEKLY and BI-WEEKLY inspections.
|
---|
80 | Please enter an existing PM work order, or the sequential portion thereof.
|
---|
81 | If there are no work orders to be closed out individually, enter <cr>.
|
---|
82 | Would you like a list of existing work orders
|
---|
83 | You have not identified any PM work orders as exceptions to Rapid Close Out.
|
---|
84 | At this point, the entire PM worklist will be closed out
|
---|
85 | , and the work orders
|
---|
86 | The following work orders will be unaffected by Rapid Close Out:
|
---|
87 | All other work orders on the
|
---|
88 | PM list for the
|
---|
89 | Shop for
|
---|
90 | are subject to Rapid Close Out.
|
---|
91 | Would you like to specify starting and stopping points for
|
---|
92 | Rapid Close Out
|
---|
93 | Please enter the starting work order (or the sequential portion thereof)
|
---|
94 | is not an existing work order. Please try again.
|
---|
95 | Now enter the last work order to be closed (or sequential portion thereof)
|
---|
96 | does not follow
|
---|
97 | Would you like to free up this terminal
|
---|
98 | Rapid close out now in progress
|
---|
99 | PMTECH(
|
---|
100 | Rapid Close Out (PMI)
|
---|
101 | If you want to close out only a portion of a PM worklist, you may specify the
|
---|
102 | first and last work orders that you want Rapid Close Out to operate on.
|
---|
103 | NOTE: Rapid Close Out will close the first and the last and everything
|
---|
104 | in between.
|
---|
105 | Are you recording a WEEKLY PMI
|
---|
106 | Recording weekly PMI's in this manner is a little unusual. Are you sure
|
---|
107 | Do you want to retain PM work orders in your Work Order File after they have
|
---|
108 | been posted to the Equipment History
|
---|
109 | ** Need an Equipment Record for PMI entry (
|
---|
110 | ** (or press <RETURN> to exit this option) **
|
---|
111 | has already been posted. If you wish to
|
---|
112 | edit it, please use the 'EDIT WORK ORDER' option.
|
---|
113 | has already been posted.
|
---|
114 | Enter the next PM work order you wish to close out, or the numeric (sequential)
|
---|
115 | portion thereof, or <RETURN> to accept the default (
|
---|
116 | to EXIT.
|
---|
117 | Deletion of PM work orders after they have been closed out is recommended
|
---|
118 | for sites that are short on disk space. The results of the PMI will be posted
|
---|
119 | to the equipment history file before the PM work order is deleted.
|
---|
120 | If disk space is not a problem, then you may wish to retain PM work orders
|
---|
121 | in accordance with your established archive criteria. In this way, the Work
|
---|
122 | Order # File will reflect scheduled as well as unscheduled work load.
|
---|
123 | For estimating purposes, each PM work order will consume about 300 bytes
|
---|
124 | of disk space (or about 3 such work orders per block).
|
---|
125 | OFF-SCHEDULE PMI
|
---|
126 | You need to enter a DATE COMPLETE in order to post this PM work order. My
|
---|
127 | guess is that you should re-edit to either enter a DATE COMPLETE or to delete
|
---|
128 | the work order ('@' in response to first prompt).
|
---|
129 | Am I right
|
---|
130 | is in the scheduled PMI program of the
|
---|
131 | The next scheduled event is a
|
---|
132 | PMI in
|
---|
133 | Would you like to change the PM schedule (at least the STARTING MONTH)
|
---|
134 | for this device at this time
|
---|
135 | You may wish to change the STARTING MONTH so that you don't perform
|
---|
136 | one PMI on the heels of another. It's your call.
|
---|
137 | It will automatically assign a PM Status of 'DEFERRED' and a close out date of
|
---|
138 | to each work order on the list.
|
---|
139 | will NOT be posted to the Equipment History during RAPID DEFERRAL.
|
---|
140 | Specified worklist doesn't seem to exist. Nothing to DEFER.
|
---|
141 | Rapid Deferral
|
---|
142 | Now enter last work order to be deferred (or sequential portion thereof)
|
---|
143 | Rapid deferral now in progress
|
---|
144 | Rapid deferral (PM worklist)
|
---|
145 | If you want to defer only a portion of a PM worklist, you may specify the
|
---|
146 | Everything between and including these two work orders will be DEFERRED.
|
---|
147 | Please enter the entire work order numbers (ex: 'PM-E9702M-102').
|
---|
148 | EQUIPMENT PMI SCHEDULES
|
---|
149 | GENERATE WEEKLY PM LIST(S)
|
---|
150 | Week number (enter an integer from 1 to 5, or '^' to escape):
|
---|
151 | GENERATE MONTHLY PM LIST(S)
|
---|
152 | PM SORT
|
---|
153 | Sort by: (E,P,I,L,C,S or ? for Help) L//
|
---|
154 | ENTRY NUMBER
|
---|
155 | PM NUMBER
|
---|
156 | LOCAL ID
|
---|
157 | Within
|
---|
158 | , shall worklist be sorted by LOCATION?
|
---|
159 | If you want this list to be ordered by LOCATION within
|
---|
160 | please enter 'YES', otherwise enter 'NO' and items will be ordered by
|
---|
161 | EQUIPMENT ENTRY NUMBER.
|
---|
162 | Shall all LOCATIONS be included
|
---|
163 | Enter 'NO' if you want to screen your worklist by DIVISION, BUILDING, WING,
|
---|
164 | and/or ROOM. If you enter 'YES' then all LOCATIONS will be included. The
|
---|
165 | sort order will be DIVISION, BUILDING, WING, and finally ROOM.
|
---|
166 | Shall worklist be sorted by RESPONSIBLE TECHNICIAN
|
---|
167 | Enter 'YES' if you want your worklist sorted by RESPONSIBLE TECHNICIAN, with
|
---|
168 | page breaks between each TECH. If you enter 'NO' then equipment items will
|
---|
169 | be selected without regard to RESPONSIBLE TECH.
|
---|
170 | For all TECH's:
|
---|
171 | You may select all TECH's or one specific TECH. Enter 'Y'es for a worklist
|
---|
172 | which includes all equipment, regardless of RESPONSIBLE TECHNICIAN.
|
---|
173 | Shall 'OUT OF SERVICE' equipment be included in worklist
|
---|
174 | Enter 'YES' if you want equipment entries with a USE STATUS of 'OUT OF
|
---|
175 | SERVICE' to appear on this PM worklist. Otherwise enter 'NO'.
|
---|
176 | For what levels of CRITICALITY: ALL//
|
---|
177 | Should equipment for which no CRITICALITY has been recorded be included on
|
---|
178 | this worklist
|
---|
179 | If we don't know the CRITICALITY do you want to see the equipment?
|
---|
180 | For all shops
|
---|
181 | You may generate worklists for ALL shops or for ONE PARTICULAR shop.
|
---|
182 | Generate Engineering PMI List
|
---|
183 | This feature enables you to print a 'partial' PMI list, containing only those
|
---|
184 | devices whose 'CRITICALITY' falls within a certain range.
|
---|
185 | For example, if your site ranks devices from 1 to 10 (10 being most critical)
|
---|
186 | and circumstances are such that you only have resources for a limited number
|
---|
187 | of PMI's in a given month, you may wish to enter something like '6-10'. This
|
---|
188 | will mean that PMI's which would normally be scheduled for devices in the
|
---|
189 | criticality range 1-5 will be suppressed, as will entries with 'CRITICALITY'
|
---|
190 | greater than 10, but since your site only uses 1 thru 10 there shouldn't be
|
---|
191 | The system will not attempt to re-schedule these PMI's for the next month,
|
---|
192 | because that would tend to defeat any efforts to balance the PM work load.
|
---|
193 | In short, this feature is not intended for routine use but rather as a sys-
|
---|
194 | tematic approach to dealing with an exceptional situation.
|
---|
195 | Entries must be in the form 'M-N' where M and N are integers in the range of
|
---|
196 | 1 to 99 and M is less than or equal to N.
|
---|
197 | For all
|
---|
198 | ENTRY NUMBERS
|
---|
199 | LOCAL ID's
|
---|
200 | EQUIPMENT CATEGORIES
|
---|
201 | Please enter 'Y'es or 'N'o.
|
---|
202 | Start with EQUIPMENT ENTRY NUMBER:
|
---|
203 | Go to ENTRY NUMBER (must be larger than
|
---|
204 | Start with:
|
---|
205 | No LOCAL IDENTIFIERS begin with:
|
---|
206 | Would you like a list of all LOCAL IDENTIFIERS
|
---|
207 | Please enter a character string which follows or equals
|
---|
208 | This string will be the end point of our search.
|
---|
209 | This entry precedes
|
---|
210 | OK. Including everything from
|
---|
211 | <cr> to continue, '^' to abort...
|
---|
212 | All worklists are sorted by shop, and within shop they may be sorted again by
|
---|
213 | RESPONSIBLE TECHNICIAN. You must now choose how this list should be sorted
|
---|
214 | further. You have the following choices:
|
---|
215 | 'E' for Equipment Entry #
|
---|
216 | 'P' for PM #
|
---|
217 | 'I' for Local Identifier
|
---|
218 | 'L' for Location
|
---|
219 | 'C' for Equipment Category
|
---|
220 | 'S' for Owning Service
|
---|
221 | Which do you wish to delete?
|
---|
222 | 1. Individual work order(s), or
|
---|
223 | 2. An entire PM work list.
|
---|
224 | Select 1 or 2:
|
---|
225 | Please enter first work order to be deleted
|
---|
226 | Are you sure
|
---|
227 | Next work order:
|
---|
228 | MONTHLY or WEEKLY PM list: MONTHLY//
|
---|
229 | This option will delete the entire
|
---|
230 | PM List of the
|
---|
231 | Just a moment, please...
|
---|
232 | PM work orders on this list. Deletion of these work orders will
|
---|
233 | not affect equipment histories. Are you sure you want to proceed
|
---|
234 | Sorry, another user is processing worklist. Please try again later.
|
---|
235 | Delete PMI List
|
---|
236 | Entry must be an existing PM work order, beginning with 'PM-', or the
|
---|
237 | sequential (numeric) portion thereof. Enter '^' to exit.
|
---|
238 | Enter '1' to delete individual PM work orders or '2' to delete a specific
|
---|
239 | worklist (MONTHLY or WEEKLY) for an entire shop.
|
---|
240 | Deletion of PM work orders which have been closed out does NOT remove them
|
---|
241 | from the equipment history.
|
---|
242 | Please enter an integer from 1 to 5.
|
---|
243 | PM Worklist was requested, but there's nothing to print.
|
---|
244 | EXPANDED PM WORK ORDERS
|
---|
245 | Abnormal termination. This worklist may be incomplete.
|
---|
246 | There are no incomplete PM work orders to print.
|
---|
247 | STATUS: P=>Pass C=>Corrective action D0=>Deferred D1=>Could not locate
|
---|
248 | D2=>In use D3=>Out of service CONDITION: LN=>Like new G=>Good P=>Poor
|
---|
249 | Y2K: FC=>Fully compl NC=>Non-compl CC=>Conditionally compl NA=>Not appl
|
---|
250 | Techs may circle STATUS and/or CONDITION. Y2K CATEGORY is information only.
|
---|
251 | Monthly
|
---|
252 | Weekly
|
---|
253 | PM List:
|
---|
254 | Shop for
|
---|
255 | Order:
|
---|
256 | Includes
|
---|
257 | Does not include
|
---|
258 | OUT OF SERVICE Equip.
|
---|
259 | Responsible Tech:
|
---|
260 | Entry # Equipment Category Model Serial Number
|
---|
261 | [ROOM-BLDG-DIV (Wing)] Manufacturer Equipment Name Local ID
|
---|
262 | Status PM # Manufacturer Service
|
---|
263 | Work Order Number
|
---|
264 | (Criticality Range:
|
---|
265 | PM Worklist for
|
---|
266 | Sort Order:
|
---|
267 | Entry # Equipment Category Model Serial Number
|
---|
268 | Local ID
|
---|
269 | PM # Manufacturer
|
---|
270 | IN USE
|
---|
271 | OUT OF SERVICE
|
---|
272 | LOANED OUT
|
---|
273 | ON LOAN
|
---|
274 | Crit:
|
---|
275 | Freq:
|
---|
276 | Level:
|
---|
277 | JCAHO: YES
|
---|
278 | Initials:_____ Date:_______ Hours:_____
|
---|
279 | Cost:______
|
---|
280 | PM Status (circle): P C D0 D1 D2 D3 Condition
|
---|
281 | Initials:_______ Date:___________ Hours:______
|
---|
282 | Cost:________
|
---|
283 | PM Status (circle): P C D0 D1 D2 D3 Condition
|
---|
284 | Unexpired Warranty (
|
---|
285 | Missed Last PMI
|
---|
286 | could not locate
|
---|
287 | in use
|
---|
288 | out of service
|
---|
289 | HAZARD ALERT(
|
---|
290 | IMPORTANT: Device MUST be isolated & rendered inoperative before servicing.
|
---|
291 | EQUIPMENT MANAGEMENT REPORTS
|
---|
292 | WARRANTY EXPIRATION TEMPLATE
|
---|
293 | ENZEQ WARRANTY
|
---|
294 | WARRANTY EXP. DATE
|
---|
295 | EQUIPMENT REPLACEMENT TEMPLATE
|
---|
296 | ENZEQ REPLACEMENT
|
---|
297 | REPLACEMENT DATE;S1
|
---|
298 | Couldn't determine topmost parent system (>50 levels).
|
---|
299 | Equipment Entry #
|
---|
300 | is a component of Entry #
|
---|
301 | Would you prefer a history of the Entry #
|
---|
302 | Answer YES to print a history for the parent system (includes components).
|
---|
303 | #################### #################### ####################
|
---|
304 | #################### #################### ####################
|
---|
305 | #################### #################### ####################
|
---|
306 | #################### #################### ####################
|
---|
307 | #################### #################### ####################
|
---|