source: internationalization/trunk/TranslationSpreadsheets/WV-DIALOG-0084.txt@ 929

Last change on this file since 929 was 604, checked in by George Lilly, 15 years ago

Internationalization

File size: 9.0 KB
Line 
1English French Notes Complete/Exclude
2Another user is editing this entry. Please try again later.
3DEVELOPMENT OF NEW CEMETARY
4.01///DEVELOPMENT OF NEW CEMETERY
5.01///54515/STEAM DISTRIBUTION SYS,PREV MAINT
6.01///55210/LAUNDRY & DRYCLEANING EQUIP,PMI
7.01///55536/NUCLEAR MEDICINE EQUIP,REPAIR
8.01///55537/NUCLEAR MEDICINE EQUIP,REPLACE
9Engineering users are active. Cannot proceed.
10DON'T SEE YOUR STATION NUMBER. Please check Eng Init Parameters File.
11Must upgrade to Version 6.5 before proceeding.
12One or more WORK ACTIONS don't have pointers to NEW WORK ACTIONS.
13Patch EN*6.5*5 must be fully installed prior to installation
14of Engineering 7.0.
15Installation aborted. Database unchanged.
16Correcting ENG DJ SCREEN 'ENEQNX1'...
17ERROR - Screen ENEQNX1 not found in ENG DJ SCREEN file!
18ERROR - Label MANUFACTURER not found in ENEQNX1 Screen in ENG DJ SCREEN file!
19Correction completed. This routine (ENPAT14) can be deleted.
20Please set DUZ(0)=
21 and re-run this routine
22Moving inappropriately posted PM manhours
23Modifying Data in File #7336.9 (OFM BUDGET CATEGORY)
24ERROR - File 7336.9 Not Found
25MA,MI,MM
26MA,MI,MM,NR
27Modifying Data in File #7336.8 (OFM PROJ CATEGORY)
28ERROR - File 7336.8 Not Found
29Re-Indexing ENG SPACE (#6928) file
30ERROR -
31PATCH 7*35 PM DELETE
32Deletion of Old Incomplete PM Work Orders
33 old incomplete PM work orders were just deleted.
34 Press RETURN to continue
35Select PROJECT NUMBER:
36File is use, Please try later!
37Must Support 132 Character Display
38Printing VAF 10-1193
39Hit <RETURN> to Continue; '^' to Quit
40Hit <RETURN> to Continue
41File in use, Please try later!
42Project Applications are not currently supported for Lease projects.
43File in Use, Please try later
44 AREA CAT
45PRIORITY
46 PRIORITIZATION SCORING SHEET
47Printing Minor Design/Misc Prioritization Sheet
48Project Title:
49Project #
50TOTAL ESTIMATED: Construction Cost:
51Design Cost:
52Activations FY:
53Additional FTEE Required:
54Recurring PS $:
55Non-Recurring All Other $:
56Equipment $:
57Travel .007 $:
58Recurring all other $:
59Major/Minor Funded Projects to which Domino
60Title
61Equipment Over $250K:
62Qty:
63Qty:
64Brief Project Description:
651. Cited JCAHO/AALAC/CAP Accreditation Deficiency.
66Page
67Name/Title
684. Energy Conservation:
695. Category Bonus (Scope Dependent):
70FACTOR SUBTOTAL
716. VAMC Priority: [Rank and Submit
722 Minor Design projects
73no more than 4 Minor Misc
74VAMC & FACTOR SUBTOTAL
75Region to Complete:
767. Priority Equipment: High Technology/High Cost [Must be one of Region's
77top 5 priorities on Over $250K nat'l priority list; equipment name/cost should
78be listed above]
79YES = 10
80NO = 0
818. Region Priority: [Rank and Submit
8212 Minor Design
8335 Minor Miscellaneous
84Priority:
85Points
86TOTAL SCORE
87Minor Attachment
88Rev 1/5/93
89Project #:
90Budget Year of 5-Yr Plan
91Enter a Fiscal Year between 1995 and 2099
92Note: This is the Plan's, not the Project's Budget Year
93This year enables differentiation among current, budget and out year projects
94Enter the 4-digit Budget Year of the Plan
95No Projects on file for this Site
96VAMC:
97Select Division to be included in report or leave blank for all
98Start with year:
99:CURRENT YR;
100:BUDGET YR;
101:BUDGET YR+1;
102:BUDGET YR+2;
103:BUDGET YR+3;
104:BUDGET YR+4;FUTURE:FUTURE YEARS
105Enter a 4 digit year from
106 or FUTURE
107Go to year:
108:BUDGET YR
109:CURRENT YR
110FUTURE:FUTURE YEARS
111Enter FUTURE
112 or a four digit year from
113Level of detail:
114Enter a code (L, S, E, D, or H)
115L (LOWEST) Prints only project list pages.
116S (SUMMARY) Prints project list and final summary pages.
117E (EQUIPMENT) Prints equipment page only.
118D (DEFAULT) Prints project list, final summary,
119 and equipment list pages. Prints detail
120 pages for BUDGET and BUDGET+1 years.
121H (HIGHEST) Prints project list, final summary,
122 pages for BUDGET through BUDGET+4 years.
123* Must Support 132 Character Display
124Five Year Facility Plan Report
125MI-MISC
126TOTAL COST (Excluding Expedited Leases)
127Project Count
128 LEASE (excludes Expedited) =
129 MINOR MISC =
130CURRENT YEAR APPROVED
131FUTURE YEARS
132BUDGET YEAR
133 PROJECT LIST
134PROJ #
135* C = Construction dollars only D = Design dollars only
136FIVE YEAR FACILITY PLAN
137PROJECT NUMBER:
138FACILITY TYPE:
139PROGRAM:
140MCPS SCORE:
141# NEW NHCU BEDS:
142BONUS CATEGORY:
143# NHCU BEDS RENOVATED:
144AMBULATORY CARE PERCENTAGE:
145# NHCU BEDS CONVERTED:
146BUDGET CATEGORY:
147FUNDING YEAR
148ESTIMATED COST (in $000)
149APPROVED COST (in $000)
150LEASE TYPE:
151PROPOSED LEASE TERM:
152RENTABLE SQ FT:
153NET PARKING:
154AWARD LEASE
155 (Lump Sum)
156RENT STARTS
157 (Annual Rent)
158EXISTING SPACE RENTABLE SQ FT:
159EXISTING SPACE ANNUAL RENT:
160ACTIVATIONS: FISCAL YEAR REQUIRED:
161(costs in $000)
162ADD'L FTEE REQUIRED:
163EQUIPMENT:
164RECURRING PS:
165RECURRING ALL OTHER:
166NON-RECURRING ALL OTHER:
167TRAVEL .007:
168EQUIPMENT OVER $250K:
169ADD/REPL
170TOTAL COST (in $000)
171none listed
172TOTAL COST
173BUILDINGS:
174CITED DEFICIENCY:
175 PROJECT DETAIL
176Note: Equipment not included for projects in
177current year (
178future years (>
179EQUIPMENT OVER $250K LIST
180FUNDING YR
181EQUIPMENT NAME
182ADD/
183TOT COST
184CONST/RENT
185SHORT DESCRIPTION:
186SHORT JUSTIFICATION:
187ENT(ENYR,
188PLAN TOTAL
189ENB(
190FY FUTURE
191PLAN+FUTURE
192ENC(
193PLAN SUMMARY BY PROGRAMS AND FISCAL YEARS (in $000)
194MINOR MISC
195CONST TOTAL
196LEASE TOTAL
197PLAN and PLAN+FUTURE counts only include split year projects once and may not equal the sum of the year counts.
198Lease column excludes Expedited leases.
199Sorry, You lack a Security Key required for Approval Authority
200Chief Engineer must sign approval before VAMC Director
201Project Number:
202Program:
203Do you wish to view a project summary:
204Enter 'Y' to see additional information about this project.
205Project was previously approved by
206Do you want to change the approval status
207PROJECT APPLICATION
208PROJECT NUMBER
209EXECUTIVE SUMMARY
210*********** COST DATA ***********
21140. CONSTRUCTION METHOD PLANNED:
21241. AE $ REQUIRED IN FY:
21342. CONST $ REQUIRED IN FY:
21443. NRM COSTS:
21544. MAJOR/MINOR/MINOR MISC. COSTS:
21646. TOTAL BSEA COSTS:
21747. TOTAL BSER COSTS:
21848. TOTAL MI COSTS:
21949. TOTAL CONST. COST (LOW BID):
22054. TOTAL CONST. COST (LOW BID):
22150. CONST CONTCY % AND $:
22255. CONST CONTCY % AND $:
22351. IMPACT COSTS:
22456. IMPACT COSTS:
22552. TECHNICAL SERVICES % AND $
22657. TECHNICAL SERVICES % AND $
22753. TOTAL PROJECT COSTS:
22858. TOTAL PROJECT COSTS:
229*********** ACTIVATION DATA ***********
23059. ACTIVATION $ REQUIRED IN FY:
23166. EQUIP OVER $250K :
232EQPMT (OVER $250K)
23360. ADDITIONAL FTEE:
23467. VAMC SCORE:
23561. RECURRING PS $ :
23668. REGION SCORE:
23762. RECURRING ALL OTHER $ :
23864. NON-RECURRING ALL OTHER $ :
23969. TOTAL PROJECT SCORE:
24070. CHIEF ENGINEERING SVC/DESIGNEE:
24172. DIRECTOR FACILITY/DESIGNEE:
24274. REGION PROJECT VALIDATION:
243VAF 10-1193 REVISED 5/95 p.2
244DETAILED PROJECT DESCRIPTION:
245DETAILED PROJECT JUSTIFICATION:
246IMPACT JUSTIFICATION:
247VAF 10-1193 REVISED 5/95 p.3
248*********** GENERAL DATA ***********
2491. PROJECT PROGRAM:
2503. FACILITY PRIORITY:
2515. PROJECT TITLE:
2526. PROJECT NUMBER:
2538. EQUIPMENT OVER :
254NUMBER(S)
25510. BUILDING OCCUPANCY:
25611a. PROJECT CATEGORY:
25711b. BONUS CATEGORY:
25811c. SIR RATING:
25911d. % ENERGY TARGET ACHIEVED: (Region enters)
26012a. BUDGET CATEGORY:
26112b. EPA CATEGORY:
26213. NET BED CHANGE:
26314. LISTED ON 5 YR FACILITY PLAN:
26415. 5-YR FACILITY PLAN FY:
26516. NET PARKING CHANGE:
26617. PROJECT DESCRIPTION:
26718. PROJECT JUSTIFICATION:
26820. FDP UPDATE COMPLETED:
269* Reserved for Future Use *
27021. DEPARTMENT/SERVICE OR TECHNICAL
27122. FDP CRITICAL
27223. FDP CORRECTIVE
273DEFICIENCIES TO BE ADDRESSED
274ACTION #
27524. PROJECT SCOPE:
276NSF GSF
27729.-30. NSF & GSF TOTALS:
278HISTORICAL:
279ENVIRONMENTAL:
280SEISMIC:
281HAZARDOUS MAT'LS:
282TRANSPORT:
283PARKING:
284IMPACT:
285Information (if any) moved to Impact Justification on page 3.
286VAF 10-1193 REVISED 5/95 p.1
287PROJECT APPLICATION - SIGN OFF SUMMARY
288PROJECT PROGRAM:
289FACILITY PRIORITY:
290TOTAL PROJECT SCORE:
291EMERGENCY APPLICATION:
292EQUIPMENT OVER $250K APPLICATION:
293BUILDING NUMBER(S):
294BUILDING OCCUPANCY:
295NET BED CHANGE:
296NET PARKING CHANGE:
297LISTED ON 5 YR FACILITY PLAN:
2985-YR FACILITY PLAN FY:
299NEW NET SQ. FT.:
300NEW GROSS SQ. FT.:
301RENOVATED NET SQ. FT.:
302RENOVATED GROSS SQ. FT.:
303#################### #################### ####################
304#################### #################### ####################
305#################### #################### ####################
306#################### #################### ####################
307#################### #################### ####################
Note: See TracBrowser for help on using the repository browser.