| [604] | 1 | English French Notes Complete/Exclude
|
|---|
| 2 | AE $ REQUIRED IN FY:
|
|---|
| 3 | CONSTRUCTION $ REQUIRED IN FY:
|
|---|
| 4 | PLANNED CONSTRUCTION METHOD:
|
|---|
| 5 | TOTAL PROJECT COSTS: $
|
|---|
| 6 | PROJECT DESCRIPTION:
|
|---|
| 7 | PROJECT JUSTIFICATION:
|
|---|
| 8 | WORKLOAD:
|
|---|
| 9 | Choose method of project selection
|
|---|
| 10 | ;2:FROM LIST OF FYFP PROJECTS RETURNED TO SITE
|
|---|
| 11 | ;3:ALL PROJECTS IN FIVE YEAR FACILITY PLAN
|
|---|
| 12 | ;2:FROM LIST OF PROJECT APPLICATIONS RETURNED TO SITE
|
|---|
| 13 | ;3:SELECTED PROJECTS FROM PROGRAM-YEAR LIST
|
|---|
| 14 | ;2:ALL PROJECTS WITH MONTHLY UPDATES = YES
|
|---|
| 15 | Another user is editing this project. Can't select.
|
|---|
| 16 | No projects selected!
|
|---|
| 17 | RETURNED TO SITE
|
|---|
| 18 | No 'Returned' Projects Found!
|
|---|
| 19 | RETURNED Five Year Plan Projects
|
|---|
| 20 | RETURNED Project Applications
|
|---|
| 21 | Project
|
|---|
| 22 | is currently being edited!
|
|---|
| 23 | SCR)=number of entries in list^screen title
|
|---|
| 24 | Enter a list or range to select (1-
|
|---|
| 25 | Screen
|
|---|
| 26 | ID#
|
|---|
| 27 | Enter program that listed projects must match.
|
|---|
| 28 | Enter a 4-digit year that listed projects must have as
|
|---|
| 29 | the A/E or Construction funding year.
|
|---|
| 30 | No Projects matched selection criteria!
|
|---|
| 31 | PROGRAM (
|
|---|
| 32 | ) PROJECTS WITH FUNDING YEAR
|
|---|
| 33 | Appl
|
|---|
| 34 | 5-Yr Plan Project
|
|---|
| 35 | Proj. Application
|
|---|
| 36 | Regional Construction Database
|
|---|
| 37 | G.EN PROJECTS
|
|---|
| 38 | To: G.EN PROJECTS
|
|---|
| 39 | (s) transmitted from the site
|
|---|
| 40 | (s) have been disapproved
|
|---|
| 41 | proj. transmitted at
|
|---|
| 42 | has been set 'Non-Viable' by
|
|---|
| 43 | with the following comments.
|
|---|
| 44 | **WARNING: Project with this number not found on your system.**
|
|---|
| 45 | ) Set Non-Viable Project:
|
|---|
| 46 | has been 'Returned to Site' by
|
|---|
| 47 | with the following comments. Please make appropriate changes
|
|---|
| 48 | and re-transmit the project to the Regional Construction Database.
|
|---|
| 49 | ) Returned Project to Site:
|
|---|
| 50 | ///RETURNED TO SITE
|
|---|
| 51 | ) Disapproved Project:
|
|---|
| 52 | not found on your system.**
|
|---|
| 53 | Region Summary has Project =
|
|---|
| 54 | disapproved so status changed to CANCELED.
|
|---|
| 55 | has been 'Authorized' by
|
|---|
| 56 | The CONSTRUCTION PROJECT file will automatically be updated
|
|---|
| 57 | with the following information.
|
|---|
| 58 | STATUS AUTHORIZED
|
|---|
| 59 | MONTHLY UPDATES YES
|
|---|
| 60 | Approved A/E Funding $
|
|---|
| 61 | Approved Construction $
|
|---|
| 62 | Design Program Start (Planned)
|
|---|
| 63 | Auth Letter Received (Actual)
|
|---|
| 64 | Start Schematics (Planned)
|
|---|
| 65 | Start DD (Planned)
|
|---|
| 66 | Start CD (Planned)
|
|---|
| 67 | Issue IFB (Planned)
|
|---|
| 68 | Bid Open (Planned)
|
|---|
| 69 | Construction Award (Planned)
|
|---|
| 70 | ) Authorized Project
|
|---|
| 71 | ENX)
|
|---|
| 72 | ENDIQ(
|
|---|
| 73 | Domain not found in PROJECT PLANNING ROLLUP DOMAIN (#100) field
|
|---|
| 74 | of the ENG INIT PARAMETERS (#6910) file. Transmission aborted!
|
|---|
| 75 | Press RETURN to Continue
|
|---|
| 76 | Validating Projects
|
|---|
| 77 | No validation problems found
|
|---|
| 78 | This project
|
|---|
| 79 | the validation checks
|
|---|
| 80 | with warnings
|
|---|
| 81 | out of
|
|---|
| 82 | selected projects failed the validation checks.
|
|---|
| 83 | selected projects passed the validation checks with warnings.
|
|---|
| 84 | Do you want a detailed report
|
|---|
| 85 | Invalid Projects
|
|---|
| 86 | Project:
|
|---|
| 87 | (passed with warnings)
|
|---|
| 88 | Note: E) = Error which prevents transmission W) = Warning
|
|---|
| 89 | Five Year Facility Plan
|
|---|
| 90 | Project Application
|
|---|
| 91 | Progress Report
|
|---|
| 92 | Misc.
|
|---|
| 93 | Validation Results
|
|---|
| 94 | PROJECT NUMBER is required.
|
|---|
| 95 | PROJECT TITLE is required.
|
|---|
| 96 | MEDICAL CENTER is required.
|
|---|
| 97 | STATUS is required.
|
|---|
| 98 | PROGRAM is required.
|
|---|
| 99 | FACILITY TYPE is required.
|
|---|
| 100 | PROJECT CATEGORY is required.
|
|---|
| 101 | BUDGET CATEGORY is required.
|
|---|
| 102 | MEDICAL CENTER's STATION NUMBER (
|
|---|
| 103 | ) inconsistent with PROJECT NUMBER (
|
|---|
| 104 | ) inconsistent with format of PROJECT NUMBER (
|
|---|
| 105 | FACILITY TYPE is not NCS but PROJECT NUMBER begins with
|
|---|
| 106 | FACILITY TYPE is NCS but PROJECT NUMBER begins with
|
|---|
| 107 | ) inconsistent with FACILITY TYPE (
|
|---|
| 108 | PROJECT CATEGORY (
|
|---|
| 109 | BUDGET CATEGORY (
|
|---|
| 110 | ) inconsistent with PROGRAM (
|
|---|
| 111 | STATUS (
|
|---|
| 112 | CONSULTANT STUDY
|
|---|
| 113 | FUNDING YEAR - CONST required for PROGRAM (
|
|---|
| 114 | ) and PROJECT CATEGORY (
|
|---|
| 115 | BONUS CATEGORY is required for PROGRAM (
|
|---|
| 116 | NHCU BEDS (NEW) required for BONUS CATEGORY (
|
|---|
| 117 | NHCU BEDS (RENOVATED) required for BONUS CATEGORY (
|
|---|
| 118 | NHCU BEDS (CONVERTED) required for BONUS CATEGORY (
|
|---|
| 119 | NHCU BEDS (NEW) required for PROJECT CATEGORY (
|
|---|
| 120 | NHCU BEDS (RENOVATED) required for PROJECT CATEGORY (
|
|---|
| 121 | NHCU BEDS (CONVERTED) required for PROJECT CATEGORY (
|
|---|
| 122 | ) not supported for the 5-Yr Plan.
|
|---|
| 123 | ESTIMATED A/E COST (FYFP) required for FUNDING YEAR - A/E (
|
|---|
| 124 | ESTIMATED CONST COST (FYFP) required for FUNDING YEAR - CONST (
|
|---|
| 125 | ESTIMATED COST (
|
|---|
| 126 | ) must be >= (
|
|---|
| 127 | ) for FACILITY TYPE (
|
|---|
| 128 | ) and PROGRAM (
|
|---|
| 129 | ) must be < (
|
|---|
| 130 | ESTIMATED A/E COST (
|
|---|
| 131 | ) does not match APPROVED A/E FUNDING (
|
|---|
| 132 | ESTIMATED CONST COST (
|
|---|
| 133 | ) does not match APPROVED CONSTRUCTION (
|
|---|
| 134 | A least one FUNDING YEAR (A/E or CONST) must be the Plan's current year (
|
|---|
| 135 | ) or later.
|
|---|
| 136 | A least one FY (AWARD LEASE or RENT STARTS) must be the Plan's current year (
|
|---|
| 137 | ) inconsistent for Plan's budget year (
|
|---|
| 138 | ) inconsistent for Plan's current year (
|
|---|
| 139 | ) inconsistent for Plan.
|
|---|
| 140 | ) not supported for Project Applications.
|
|---|
| 141 | IMPACT JUSTIFICATION required when IMPACT COST > 0.
|
|---|
| 142 | No gross sq ft listed for H089 CHAPTER (
|
|---|
| 143 | EPA REPORTABLE (y/n) required for NRM applications.
|
|---|
| 144 | EPA REPORTING CATEGORY is required for EPA REPORTABLE (YES).
|
|---|
| 145 | EPA REPORTING CATEGORY (
|
|---|
| 146 | ) inconsistent with PROJECT CATEGORY (
|
|---|
| 147 | ) inappropriate for project application.
|
|---|
| 148 | Project Application must be approved by Chief Engineer.
|
|---|
| 149 | Chief Engineer approval date (
|
|---|
| 150 | ) is over 6 months old.
|
|---|
| 151 | Project Application must be approved by VAMC Director.
|
|---|
| 152 | VAMC Director approval date (
|
|---|
| 153 | PROJECT DESCRIPTION (SHORT) is required.
|
|---|
| 154 | JUSTIFICATION (SHORT) is required.
|
|---|
| 155 | AMBULATORY CARE
|
|---|
| 156 | AMBULATORY CARE PERCENTAGE (
|
|---|
| 157 | ) inconsistent with BONUS CATEGORY (
|
|---|
| 158 | ACTIVATION YEAR (
|
|---|
| 159 | ) is before FUNDING YEAR - CONST (
|
|---|
| 160 | LEASE TYPE is required.
|
|---|
| 161 | ESTIMATED ANNUAL RENT COST is required.
|
|---|
| 162 | PROPOSED LEASE TERM is required.
|
|---|
| 163 | RENTABLE SQ FT is required.
|
|---|
| 164 | EXISTING SPACE ANNUAL RENT is required for LEASE TYPE (
|
|---|
| 165 | EXISTING SPACE RENTABLE SQ FT is required for LEASE TYPE (
|
|---|
| 166 | ENHANCED USE
|
|---|
| 167 | LEASE TYPE (
|
|---|
| 168 | ) inconsistent with BUDGET CATEGORY (
|
|---|
| 169 | ) is before FY - RENT STARTS (
|
|---|
| 170 | ) not supported for Progress Reports.
|
|---|
| 171 | (PLANNED) is missing the month.
|
|---|
| 172 | (REVISED) is missing the month.
|
|---|
| 173 | (ACTUAL) is missing the month.
|
|---|
| 174 | past due. Enter actual or update revised date.
|
|---|
| 175 | (ACTUAL) entered, but percentage not 100
|
|---|
| 176 | percentage is blank (expected 0-99 since actual start date exists).
|
|---|
| 177 | percentage > 0 but actual start date is blank.
|
|---|
| 178 | (PLANNED) before planned start date.
|
|---|
| 179 | (REVISED) before start date.
|
|---|
| 180 | (ACTUAL) before actual start date.
|
|---|
| 181 | (PLANNED) milestone was skipped.
|
|---|
| 182 | (ACTUAL) milestone was skipped.
|
|---|
| 183 | (PLANNED) before previous milestone
|
|---|
| 184 | (REVISED) before previous milestone
|
|---|
| 185 | (ACTUAL) before previous milestone
|
|---|
| 186 | milestone inappropriate for project.
|
|---|
| 187 | Status (
|
|---|
| 188 | ) appears inappropriate since milestone
|
|---|
| 189 | Project appears to be completed, but has Status (
|
|---|
| 190 | ) inconsistant with FUNDING YEAR - CONST (
|
|---|
| 191 | EPA REPORTABLE (y/n) required for NRM projects.
|
|---|
| 192 | NHCU AUTHORIZED BEDS required for BONUS CATEGORY (
|
|---|
| 193 | NHCU AUTHORIZED BEDS required for PROJECT CATEGORY (
|
|---|
| 194 | NHCU BEDS (CONVERTED) (
|
|---|
| 195 | ) not equal to sum of NHCU CONVERSION numbers (
|
|---|
| 196 | This option is now Out of Order. Construction project
|
|---|
| 197 | data is now
|
|---|
| 198 | entered and reported in a web database at
|
|---|
| 199 | Please, contact your Network Capital Assets Coordinator,
|
|---|
| 200 | or VSSC
|
|---|
| 201 | representative for assistance.
|
|---|
| 202 | Your ENG INIT PARAMETERS file (#6910) is not in order.
|
|---|
| 203 | EN PROJECTS
|
|---|
| 204 | Mail group EN PROJECTS is missing.
|
|---|
| 205 | No members found in mail group EN PROJECTS. At least one is required.
|
|---|
| 206 | Should you be added as a member of EN PROJECTS
|
|---|
| 207 | Members of mail group EN PROJECTS receive messages from
|
|---|
| 208 | the VISN concerning projects which have been transmitted
|
|---|
| 209 | from their facility to the VISN Construction Database.
|
|---|
| 210 | Enter YES to be added to this mail group.
|
|---|
| 211 | No valid projects to transmit!
|
|---|
| 212 | Since some of the selected projects falied the validated checks,
|
|---|
| 213 | none of the selected projects will be transmitted.
|
|---|
| 214 | Projects which failed the validation checks will not be transmitted.
|
|---|
| 215 | Transmit remaining projects which passed the validation checks
|
|---|
| 216 | Answer yes to transmit projects which passed (including those with warnings).
|
|---|
| 217 | REPORTING PERIOD
|
|---|
| 218 | Enter the reporting period (month and year) for the
|
|---|
| 219 | progress reports. Each selected project will be
|
|---|
| 220 | updated with this reporting period before transmission.
|
|---|
| 221 | Do you want to Queue Transmission
|
|---|
| 222 | Enter 'Y' if you want the project data placed in mail
|
|---|
| 223 | messages as part of a tasked job.
|
|---|
| 224 | TRAMSIT ENG PROJECT DATA (
|
|---|
| 225 | ENT(
|
|---|
| 226 | Five Year Plan project
|
|---|
| 227 | Project Progress Report
|
|---|
| 228 | queued for transmission.
|
|---|
| 229 | transmitted using
|
|---|
| 230 | mail message
|
|---|
| 231 | ERROR DURING QUEUED TRANSMISSION
|
|---|
| 232 | Engineering Package
|
|---|
| 233 | Your queued transmission of
|
|---|
| 234 | Five Year Facility Plan Projects
|
|---|
| 235 | Project Applications
|
|---|
| 236 | Project Progress Reports
|
|---|
| 237 | was not performed because the asterisked projects were being edited.
|
|---|
| 238 | EN XMIT
|
|---|
| 239 | Site transmitted project to Region
|
|---|
| 240 | Progress note transmitted
|
|---|
| 241 | End of note (
|
|---|
| 242 | Now re-building your Work Order File.
|
|---|
| 243 | Now re-indexing Work Order File. This could take awhile...
|
|---|
| 244 | Now converting LOCATIONS in your Equipment File
|
|---|
| 245 | Now converting Work Order LOCATIONS
|
|---|
| 246 | Now converting a few data elements in your existing construction projects.
|
|---|
| 247 | This shouldn't take very long.
|
|---|
| 248 | Now re-indexing
|
|---|
| 249 | Finished at
|
|---|
| 250 | PRLOCAL]
|
|---|
| 251 | Project is locked by another user. Please try later
|
|---|
| 252 | Please enter appropriate Project and Budget Categories for the new Program.
|
|---|
| 253 | MA,MI,MM,NR,
|
|---|
| 254 | The Budget Category has automatically been changed to the default value for the new project category.
|
|---|
| 255 | (The previous value was
|
|---|
| 256 | Previous Progress Note not found.
|
|---|
| 257 | This page is optional since the project category is not NHCU.
|
|---|
| 258 | The NHCU data must be entered since the project category is NHCU.
|
|---|
| 259 | PRINT WHICH PAGES:
|
|---|
| 260 | Print Project Report (10-0051)
|
|---|
| 261 | IOINLOW;IOINHI;IOINORM
|
|---|
| 262 | Print All Project Reports (10-0051)
|
|---|
| 263 | CONSTRUCTION PROJECT PROGRESS REPORT
|
|---|
| 264 | SERVICING FACILITY:
|
|---|
| 265 | FMS #:
|
|---|
| 266 | REPORTING PERIOD:
|
|---|
| 267 | BONUS:
|
|---|
| 268 | EPA REPORTING CATEGORY:
|
|---|
| 269 | NHCU BEDS:
|
|---|
| 270 | AUTHORIZED:
|
|---|
| 271 | CONVERTED FROM:
|
|---|
| 272 | NEW:
|
|---|
| 273 | RENOVATED:
|
|---|
| 274 | CONVERTED:
|
|---|
| 275 | DESIGN:
|
|---|
| 276 | CONSTRUCTION:
|
|---|
| 277 | CONTRACT DATA
|
|---|
| 278 | SUPPLEMENTAL AGREEMENTS
|
|---|
| 279 | An asterisk '*' indicates a change since the last transmission.
|
|---|
| 280 | REVISED/
|
|---|
| 281 | ACTUAL DATE
|
|---|
| 282 | Contract:
|
|---|
| 283 | Add #:
|
|---|
| 284 | Original Award:
|
|---|
| 285 | Ded #:
|
|---|
| 286 | Net
|
|---|
| 287 | Study:
|
|---|
| 288 | Schematics:
|
|---|
| 289 | Site Survey:
|
|---|
| 290 | Design Development:
|
|---|
| 291 | Const. Documents:
|
|---|
| 292 | Site Visits:
|
|---|
| 293 | Const. Period Svcs.:
|
|---|
| 294 | Subtotal:
|
|---|
| 295 | Add #:
|
|---|
| 296 | Original Award:
|
|---|
| 297 | Ded #:
|
|---|
| 298 | Extension (days):
|
|---|
| 299 | Labor (to date):
|
|---|
| 300 | Matrls (to date):
|
|---|
| 301 | TOTAL P&H:
|
|---|
| 302 | Report Actions Due In
|
|---|
| 303 | #################### #################### ####################
|
|---|
| 304 | #################### #################### ####################
|
|---|
| 305 | #################### #################### ####################
|
|---|
| 306 | #################### #################### ####################
|
|---|
| 307 | #################### #################### ####################
|
|---|