source: internationalization/trunk/TranslationSpreadsheets/WV-DIALOG-0085.txt@ 613

Last change on this file since 613 was 604, checked in by George Lilly, 15 years ago

Internationalization

File size: 10.8 KB
Line 
1English French Notes Complete/Exclude
2AE $ REQUIRED IN FY:
3CONSTRUCTION $ REQUIRED IN FY:
4PLANNED CONSTRUCTION METHOD:
5TOTAL PROJECT COSTS: $
6PROJECT DESCRIPTION:
7PROJECT JUSTIFICATION:
8WORKLOAD:
9Choose method of project selection
10;2:FROM LIST OF FYFP PROJECTS RETURNED TO SITE
11;3:ALL PROJECTS IN FIVE YEAR FACILITY PLAN
12;2:FROM LIST OF PROJECT APPLICATIONS RETURNED TO SITE
13;3:SELECTED PROJECTS FROM PROGRAM-YEAR LIST
14;2:ALL PROJECTS WITH MONTHLY UPDATES = YES
15Another user is editing this project. Can't select.
16No projects selected!
17RETURNED TO SITE
18No 'Returned' Projects Found!
19RETURNED Five Year Plan Projects
20RETURNED Project Applications
21Project
22 is currently being edited!
23SCR)=number of entries in list^screen title
24Enter a list or range to select (1-
25Screen
26ID#
27Enter program that listed projects must match.
28Enter a 4-digit year that listed projects must have as
29the A/E or Construction funding year.
30No Projects matched selection criteria!
31PROGRAM (
32) PROJECTS WITH FUNDING YEAR
33Appl
345-Yr Plan Project
35Proj. Application
36Regional Construction Database
37G.EN PROJECTS
38To: G.EN PROJECTS
39(s) transmitted from the site
40(s) have been disapproved
41proj. transmitted at
42has been set 'Non-Viable' by
43with the following comments.
44**WARNING: Project with this number not found on your system.**
45) Set Non-Viable Project:
46has been 'Returned to Site' by
47with the following comments. Please make appropriate changes
48and re-transmit the project to the Regional Construction Database.
49) Returned Project to Site:
50///RETURNED TO SITE
51) Disapproved Project:
52 not found on your system.**
53 Region Summary has Project =
54 disapproved so status changed to CANCELED.
55has been 'Authorized' by
56The CONSTRUCTION PROJECT file will automatically be updated
57with the following information.
58STATUS AUTHORIZED
59MONTHLY UPDATES YES
60Approved A/E Funding $
61Approved Construction $
62Design Program Start (Planned)
63Auth Letter Received (Actual)
64Start Schematics (Planned)
65Start DD (Planned)
66Start CD (Planned)
67Issue IFB (Planned)
68Bid Open (Planned)
69Construction Award (Planned)
70) Authorized Project
71ENX)
72ENDIQ(
73Domain not found in PROJECT PLANNING ROLLUP DOMAIN (#100) field
74of the ENG INIT PARAMETERS (#6910) file. Transmission aborted!
75Press RETURN to Continue
76Validating Projects
77No validation problems found
78This project
79 the validation checks
80 with warnings
81 out of
82 selected projects failed the validation checks.
83 selected projects passed the validation checks with warnings.
84Do you want a detailed report
85Invalid Projects
86Project:
87 (passed with warnings)
88Note: E) = Error which prevents transmission W) = Warning
89Five Year Facility Plan
90Project Application
91Progress Report
92Misc.
93 Validation Results
94PROJECT NUMBER is required.
95PROJECT TITLE is required.
96MEDICAL CENTER is required.
97STATUS is required.
98PROGRAM is required.
99FACILITY TYPE is required.
100PROJECT CATEGORY is required.
101BUDGET CATEGORY is required.
102MEDICAL CENTER's STATION NUMBER (
103) inconsistent with PROJECT NUMBER (
104) inconsistent with format of PROJECT NUMBER (
105FACILITY TYPE is not NCS but PROJECT NUMBER begins with
106FACILITY TYPE is NCS but PROJECT NUMBER begins with
107) inconsistent with FACILITY TYPE (
108PROJECT CATEGORY (
109BUDGET CATEGORY (
110) inconsistent with PROGRAM (
111STATUS (
112CONSULTANT STUDY
113FUNDING YEAR - CONST required for PROGRAM (
114) and PROJECT CATEGORY (
115BONUS CATEGORY is required for PROGRAM (
116NHCU BEDS (NEW) required for BONUS CATEGORY (
117NHCU BEDS (RENOVATED) required for BONUS CATEGORY (
118NHCU BEDS (CONVERTED) required for BONUS CATEGORY (
119NHCU BEDS (NEW) required for PROJECT CATEGORY (
120NHCU BEDS (RENOVATED) required for PROJECT CATEGORY (
121NHCU BEDS (CONVERTED) required for PROJECT CATEGORY (
122) not supported for the 5-Yr Plan.
123ESTIMATED A/E COST (FYFP) required for FUNDING YEAR - A/E (
124ESTIMATED CONST COST (FYFP) required for FUNDING YEAR - CONST (
125ESTIMATED COST (
126) must be >= (
127) for FACILITY TYPE (
128) and PROGRAM (
129) must be < (
130ESTIMATED A/E COST (
131) does not match APPROVED A/E FUNDING (
132ESTIMATED CONST COST (
133) does not match APPROVED CONSTRUCTION (
134A least one FUNDING YEAR (A/E or CONST) must be the Plan's current year (
135) or later.
136A least one FY (AWARD LEASE or RENT STARTS) must be the Plan's current year (
137) inconsistent for Plan's budget year (
138) inconsistent for Plan's current year (
139) inconsistent for Plan.
140) not supported for Project Applications.
141IMPACT JUSTIFICATION required when IMPACT COST > 0.
142No gross sq ft listed for H089 CHAPTER (
143EPA REPORTABLE (y/n) required for NRM applications.
144EPA REPORTING CATEGORY is required for EPA REPORTABLE (YES).
145EPA REPORTING CATEGORY (
146) inconsistent with PROJECT CATEGORY (
147) inappropriate for project application.
148Project Application must be approved by Chief Engineer.
149Chief Engineer approval date (
150) is over 6 months old.
151Project Application must be approved by VAMC Director.
152VAMC Director approval date (
153PROJECT DESCRIPTION (SHORT) is required.
154JUSTIFICATION (SHORT) is required.
155AMBULATORY CARE
156AMBULATORY CARE PERCENTAGE (
157) inconsistent with BONUS CATEGORY (
158ACTIVATION YEAR (
159) is before FUNDING YEAR - CONST (
160LEASE TYPE is required.
161ESTIMATED ANNUAL RENT COST is required.
162PROPOSED LEASE TERM is required.
163RENTABLE SQ FT is required.
164EXISTING SPACE ANNUAL RENT is required for LEASE TYPE (
165EXISTING SPACE RENTABLE SQ FT is required for LEASE TYPE (
166ENHANCED USE
167LEASE TYPE (
168) inconsistent with BUDGET CATEGORY (
169) is before FY - RENT STARTS (
170) not supported for Progress Reports.
171 (PLANNED) is missing the month.
172 (REVISED) is missing the month.
173 (ACTUAL) is missing the month.
174 past due. Enter actual or update revised date.
175 (ACTUAL) entered, but percentage not 100
176 percentage is blank (expected 0-99 since actual start date exists).
177 percentage > 0 but actual start date is blank.
178 (PLANNED) before planned start date.
179 (REVISED) before start date.
180 (ACTUAL) before actual start date.
181 (PLANNED) milestone was skipped.
182 (ACTUAL) milestone was skipped.
183 (PLANNED) before previous milestone
184 (REVISED) before previous milestone
185 (ACTUAL) before previous milestone
186 milestone inappropriate for project.
187Status (
188) appears inappropriate since milestone
189Project appears to be completed, but has Status (
190) inconsistant with FUNDING YEAR - CONST (
191EPA REPORTABLE (y/n) required for NRM projects.
192NHCU AUTHORIZED BEDS required for BONUS CATEGORY (
193NHCU AUTHORIZED BEDS required for PROJECT CATEGORY (
194NHCU BEDS (CONVERTED) (
195) not equal to sum of NHCU CONVERSION numbers (
196 This option is now Out of Order. Construction project
197data is now
198 entered and reported in a web database at
199 Please, contact your Network Capital Assets Coordinator,
200 or VSSC
201 representative for assistance.
202Your ENG INIT PARAMETERS file (#6910) is not in order.
203EN PROJECTS
204Mail group EN PROJECTS is missing.
205No members found in mail group EN PROJECTS. At least one is required.
206Should you be added as a member of EN PROJECTS
207Members of mail group EN PROJECTS receive messages from
208the VISN concerning projects which have been transmitted
209from their facility to the VISN Construction Database.
210Enter YES to be added to this mail group.
211No valid projects to transmit!
212Since some of the selected projects falied the validated checks,
213none of the selected projects will be transmitted.
214Projects which failed the validation checks will not be transmitted.
215Transmit remaining projects which passed the validation checks
216Answer yes to transmit projects which passed (including those with warnings).
217REPORTING PERIOD
218Enter the reporting period (month and year) for the
219progress reports. Each selected project will be
220updated with this reporting period before transmission.
221Do you want to Queue Transmission
222Enter 'Y' if you want the project data placed in mail
223messages as part of a tasked job.
224TRAMSIT ENG PROJECT DATA (
225ENT(
226Five Year Plan project
227Project Progress Report
228 queued for transmission.
229 transmitted using
230 mail message
231ERROR DURING QUEUED TRANSMISSION
232Engineering Package
233Your queued transmission of
234Five Year Facility Plan Projects
235Project Applications
236Project Progress Reports
237was not performed because the asterisked projects were being edited.
238EN XMIT
239 Site transmitted project to Region
240Progress note transmitted
241End of note (
242Now re-building your Work Order File.
243Now re-indexing Work Order File. This could take awhile...
244Now converting LOCATIONS in your Equipment File
245Now converting Work Order LOCATIONS
246Now converting a few data elements in your existing construction projects.
247This shouldn't take very long.
248Now re-indexing
249Finished at
250PRLOCAL]
251Project is locked by another user. Please try later
252Please enter appropriate Project and Budget Categories for the new Program.
253MA,MI,MM,NR,
254The Budget Category has automatically been changed to the default value for the new project category.
255 (The previous value was
256Previous Progress Note not found.
257This page is optional since the project category is not NHCU.
258The NHCU data must be entered since the project category is NHCU.
259PRINT WHICH PAGES:
260Print Project Report (10-0051)
261IOINLOW;IOINHI;IOINORM
262Print All Project Reports (10-0051)
263CONSTRUCTION PROJECT PROGRESS REPORT
264SERVICING FACILITY:
265FMS #:
266REPORTING PERIOD:
267BONUS:
268EPA REPORTING CATEGORY:
269NHCU BEDS:
270AUTHORIZED:
271CONVERTED FROM:
272NEW:
273RENOVATED:
274CONVERTED:
275DESIGN:
276CONSTRUCTION:
277CONTRACT DATA
278SUPPLEMENTAL AGREEMENTS
279 An asterisk '*' indicates a change since the last transmission.
280REVISED/
281ACTUAL DATE
282Contract:
283Add #:
284Original Award:
285Ded #:
286Net
287Study:
288Schematics:
289Site Survey:
290Design Development:
291Const. Documents:
292Site Visits:
293Const. Period Svcs.:
294Subtotal:
295Add #:
296Original Award:
297Ded #:
298Extension (days):
299Labor (to date):
300Matrls (to date):
301TOTAL P&H:
302Report Actions Due In
303#################### #################### ####################
304#################### #################### ####################
305#################### #################### ####################
306#################### #################### ####################
307#################### #################### ####################
Note: See TracBrowser for help on using the repository browser.