1 | English French Notes Complete/Exclude
|
---|
2 | AE $ REQUIRED IN FY:
|
---|
3 | CONSTRUCTION $ REQUIRED IN FY:
|
---|
4 | PLANNED CONSTRUCTION METHOD:
|
---|
5 | TOTAL PROJECT COSTS: $
|
---|
6 | PROJECT DESCRIPTION:
|
---|
7 | PROJECT JUSTIFICATION:
|
---|
8 | WORKLOAD:
|
---|
9 | Choose method of project selection
|
---|
10 | ;2:FROM LIST OF FYFP PROJECTS RETURNED TO SITE
|
---|
11 | ;3:ALL PROJECTS IN FIVE YEAR FACILITY PLAN
|
---|
12 | ;2:FROM LIST OF PROJECT APPLICATIONS RETURNED TO SITE
|
---|
13 | ;3:SELECTED PROJECTS FROM PROGRAM-YEAR LIST
|
---|
14 | ;2:ALL PROJECTS WITH MONTHLY UPDATES = YES
|
---|
15 | Another user is editing this project. Can't select.
|
---|
16 | No projects selected!
|
---|
17 | RETURNED TO SITE
|
---|
18 | No 'Returned' Projects Found!
|
---|
19 | RETURNED Five Year Plan Projects
|
---|
20 | RETURNED Project Applications
|
---|
21 | Project
|
---|
22 | is currently being edited!
|
---|
23 | SCR)=number of entries in list^screen title
|
---|
24 | Enter a list or range to select (1-
|
---|
25 | Screen
|
---|
26 | ID#
|
---|
27 | Enter program that listed projects must match.
|
---|
28 | Enter a 4-digit year that listed projects must have as
|
---|
29 | the A/E or Construction funding year.
|
---|
30 | No Projects matched selection criteria!
|
---|
31 | PROGRAM (
|
---|
32 | ) PROJECTS WITH FUNDING YEAR
|
---|
33 | Appl
|
---|
34 | 5-Yr Plan Project
|
---|
35 | Proj. Application
|
---|
36 | Regional Construction Database
|
---|
37 | G.EN PROJECTS
|
---|
38 | To: G.EN PROJECTS
|
---|
39 | (s) transmitted from the site
|
---|
40 | (s) have been disapproved
|
---|
41 | proj. transmitted at
|
---|
42 | has been set 'Non-Viable' by
|
---|
43 | with the following comments.
|
---|
44 | **WARNING: Project with this number not found on your system.**
|
---|
45 | ) Set Non-Viable Project:
|
---|
46 | has been 'Returned to Site' by
|
---|
47 | with the following comments. Please make appropriate changes
|
---|
48 | and re-transmit the project to the Regional Construction Database.
|
---|
49 | ) Returned Project to Site:
|
---|
50 | ///RETURNED TO SITE
|
---|
51 | ) Disapproved Project:
|
---|
52 | not found on your system.**
|
---|
53 | Region Summary has Project =
|
---|
54 | disapproved so status changed to CANCELED.
|
---|
55 | has been 'Authorized' by
|
---|
56 | The CONSTRUCTION PROJECT file will automatically be updated
|
---|
57 | with the following information.
|
---|
58 | STATUS AUTHORIZED
|
---|
59 | MONTHLY UPDATES YES
|
---|
60 | Approved A/E Funding $
|
---|
61 | Approved Construction $
|
---|
62 | Design Program Start (Planned)
|
---|
63 | Auth Letter Received (Actual)
|
---|
64 | Start Schematics (Planned)
|
---|
65 | Start DD (Planned)
|
---|
66 | Start CD (Planned)
|
---|
67 | Issue IFB (Planned)
|
---|
68 | Bid Open (Planned)
|
---|
69 | Construction Award (Planned)
|
---|
70 | ) Authorized Project
|
---|
71 | ENX)
|
---|
72 | ENDIQ(
|
---|
73 | Domain not found in PROJECT PLANNING ROLLUP DOMAIN (#100) field
|
---|
74 | of the ENG INIT PARAMETERS (#6910) file. Transmission aborted!
|
---|
75 | Press RETURN to Continue
|
---|
76 | Validating Projects
|
---|
77 | No validation problems found
|
---|
78 | This project
|
---|
79 | the validation checks
|
---|
80 | with warnings
|
---|
81 | out of
|
---|
82 | selected projects failed the validation checks.
|
---|
83 | selected projects passed the validation checks with warnings.
|
---|
84 | Do you want a detailed report
|
---|
85 | Invalid Projects
|
---|
86 | Project:
|
---|
87 | (passed with warnings)
|
---|
88 | Note: E) = Error which prevents transmission W) = Warning
|
---|
89 | Five Year Facility Plan
|
---|
90 | Project Application
|
---|
91 | Progress Report
|
---|
92 | Misc.
|
---|
93 | Validation Results
|
---|
94 | PROJECT NUMBER is required.
|
---|
95 | PROJECT TITLE is required.
|
---|
96 | MEDICAL CENTER is required.
|
---|
97 | STATUS is required.
|
---|
98 | PROGRAM is required.
|
---|
99 | FACILITY TYPE is required.
|
---|
100 | PROJECT CATEGORY is required.
|
---|
101 | BUDGET CATEGORY is required.
|
---|
102 | MEDICAL CENTER's STATION NUMBER (
|
---|
103 | ) inconsistent with PROJECT NUMBER (
|
---|
104 | ) inconsistent with format of PROJECT NUMBER (
|
---|
105 | FACILITY TYPE is not NCS but PROJECT NUMBER begins with
|
---|
106 | FACILITY TYPE is NCS but PROJECT NUMBER begins with
|
---|
107 | ) inconsistent with FACILITY TYPE (
|
---|
108 | PROJECT CATEGORY (
|
---|
109 | BUDGET CATEGORY (
|
---|
110 | ) inconsistent with PROGRAM (
|
---|
111 | STATUS (
|
---|
112 | CONSULTANT STUDY
|
---|
113 | FUNDING YEAR - CONST required for PROGRAM (
|
---|
114 | ) and PROJECT CATEGORY (
|
---|
115 | BONUS CATEGORY is required for PROGRAM (
|
---|
116 | NHCU BEDS (NEW) required for BONUS CATEGORY (
|
---|
117 | NHCU BEDS (RENOVATED) required for BONUS CATEGORY (
|
---|
118 | NHCU BEDS (CONVERTED) required for BONUS CATEGORY (
|
---|
119 | NHCU BEDS (NEW) required for PROJECT CATEGORY (
|
---|
120 | NHCU BEDS (RENOVATED) required for PROJECT CATEGORY (
|
---|
121 | NHCU BEDS (CONVERTED) required for PROJECT CATEGORY (
|
---|
122 | ) not supported for the 5-Yr Plan.
|
---|
123 | ESTIMATED A/E COST (FYFP) required for FUNDING YEAR - A/E (
|
---|
124 | ESTIMATED CONST COST (FYFP) required for FUNDING YEAR - CONST (
|
---|
125 | ESTIMATED COST (
|
---|
126 | ) must be >= (
|
---|
127 | ) for FACILITY TYPE (
|
---|
128 | ) and PROGRAM (
|
---|
129 | ) must be < (
|
---|
130 | ESTIMATED A/E COST (
|
---|
131 | ) does not match APPROVED A/E FUNDING (
|
---|
132 | ESTIMATED CONST COST (
|
---|
133 | ) does not match APPROVED CONSTRUCTION (
|
---|
134 | A least one FUNDING YEAR (A/E or CONST) must be the Plan's current year (
|
---|
135 | ) or later.
|
---|
136 | A least one FY (AWARD LEASE or RENT STARTS) must be the Plan's current year (
|
---|
137 | ) inconsistent for Plan's budget year (
|
---|
138 | ) inconsistent for Plan's current year (
|
---|
139 | ) inconsistent for Plan.
|
---|
140 | ) not supported for Project Applications.
|
---|
141 | IMPACT JUSTIFICATION required when IMPACT COST > 0.
|
---|
142 | No gross sq ft listed for H089 CHAPTER (
|
---|
143 | EPA REPORTABLE (y/n) required for NRM applications.
|
---|
144 | EPA REPORTING CATEGORY is required for EPA REPORTABLE (YES).
|
---|
145 | EPA REPORTING CATEGORY (
|
---|
146 | ) inconsistent with PROJECT CATEGORY (
|
---|
147 | ) inappropriate for project application.
|
---|
148 | Project Application must be approved by Chief Engineer.
|
---|
149 | Chief Engineer approval date (
|
---|
150 | ) is over 6 months old.
|
---|
151 | Project Application must be approved by VAMC Director.
|
---|
152 | VAMC Director approval date (
|
---|
153 | PROJECT DESCRIPTION (SHORT) is required.
|
---|
154 | JUSTIFICATION (SHORT) is required.
|
---|
155 | AMBULATORY CARE
|
---|
156 | AMBULATORY CARE PERCENTAGE (
|
---|
157 | ) inconsistent with BONUS CATEGORY (
|
---|
158 | ACTIVATION YEAR (
|
---|
159 | ) is before FUNDING YEAR - CONST (
|
---|
160 | LEASE TYPE is required.
|
---|
161 | ESTIMATED ANNUAL RENT COST is required.
|
---|
162 | PROPOSED LEASE TERM is required.
|
---|
163 | RENTABLE SQ FT is required.
|
---|
164 | EXISTING SPACE ANNUAL RENT is required for LEASE TYPE (
|
---|
165 | EXISTING SPACE RENTABLE SQ FT is required for LEASE TYPE (
|
---|
166 | ENHANCED USE
|
---|
167 | LEASE TYPE (
|
---|
168 | ) inconsistent with BUDGET CATEGORY (
|
---|
169 | ) is before FY - RENT STARTS (
|
---|
170 | ) not supported for Progress Reports.
|
---|
171 | (PLANNED) is missing the month.
|
---|
172 | (REVISED) is missing the month.
|
---|
173 | (ACTUAL) is missing the month.
|
---|
174 | past due. Enter actual or update revised date.
|
---|
175 | (ACTUAL) entered, but percentage not 100
|
---|
176 | percentage is blank (expected 0-99 since actual start date exists).
|
---|
177 | percentage > 0 but actual start date is blank.
|
---|
178 | (PLANNED) before planned start date.
|
---|
179 | (REVISED) before start date.
|
---|
180 | (ACTUAL) before actual start date.
|
---|
181 | (PLANNED) milestone was skipped.
|
---|
182 | (ACTUAL) milestone was skipped.
|
---|
183 | (PLANNED) before previous milestone
|
---|
184 | (REVISED) before previous milestone
|
---|
185 | (ACTUAL) before previous milestone
|
---|
186 | milestone inappropriate for project.
|
---|
187 | Status (
|
---|
188 | ) appears inappropriate since milestone
|
---|
189 | Project appears to be completed, but has Status (
|
---|
190 | ) inconsistant with FUNDING YEAR - CONST (
|
---|
191 | EPA REPORTABLE (y/n) required for NRM projects.
|
---|
192 | NHCU AUTHORIZED BEDS required for BONUS CATEGORY (
|
---|
193 | NHCU AUTHORIZED BEDS required for PROJECT CATEGORY (
|
---|
194 | NHCU BEDS (CONVERTED) (
|
---|
195 | ) not equal to sum of NHCU CONVERSION numbers (
|
---|
196 | This option is now Out of Order. Construction project
|
---|
197 | data is now
|
---|
198 | entered and reported in a web database at
|
---|
199 | Please, contact your Network Capital Assets Coordinator,
|
---|
200 | or VSSC
|
---|
201 | representative for assistance.
|
---|
202 | Your ENG INIT PARAMETERS file (#6910) is not in order.
|
---|
203 | EN PROJECTS
|
---|
204 | Mail group EN PROJECTS is missing.
|
---|
205 | No members found in mail group EN PROJECTS. At least one is required.
|
---|
206 | Should you be added as a member of EN PROJECTS
|
---|
207 | Members of mail group EN PROJECTS receive messages from
|
---|
208 | the VISN concerning projects which have been transmitted
|
---|
209 | from their facility to the VISN Construction Database.
|
---|
210 | Enter YES to be added to this mail group.
|
---|
211 | No valid projects to transmit!
|
---|
212 | Since some of the selected projects falied the validated checks,
|
---|
213 | none of the selected projects will be transmitted.
|
---|
214 | Projects which failed the validation checks will not be transmitted.
|
---|
215 | Transmit remaining projects which passed the validation checks
|
---|
216 | Answer yes to transmit projects which passed (including those with warnings).
|
---|
217 | REPORTING PERIOD
|
---|
218 | Enter the reporting period (month and year) for the
|
---|
219 | progress reports. Each selected project will be
|
---|
220 | updated with this reporting period before transmission.
|
---|
221 | Do you want to Queue Transmission
|
---|
222 | Enter 'Y' if you want the project data placed in mail
|
---|
223 | messages as part of a tasked job.
|
---|
224 | TRAMSIT ENG PROJECT DATA (
|
---|
225 | ENT(
|
---|
226 | Five Year Plan project
|
---|
227 | Project Progress Report
|
---|
228 | queued for transmission.
|
---|
229 | transmitted using
|
---|
230 | mail message
|
---|
231 | ERROR DURING QUEUED TRANSMISSION
|
---|
232 | Engineering Package
|
---|
233 | Your queued transmission of
|
---|
234 | Five Year Facility Plan Projects
|
---|
235 | Project Applications
|
---|
236 | Project Progress Reports
|
---|
237 | was not performed because the asterisked projects were being edited.
|
---|
238 | EN XMIT
|
---|
239 | Site transmitted project to Region
|
---|
240 | Progress note transmitted
|
---|
241 | End of note (
|
---|
242 | Now re-building your Work Order File.
|
---|
243 | Now re-indexing Work Order File. This could take awhile...
|
---|
244 | Now converting LOCATIONS in your Equipment File
|
---|
245 | Now converting Work Order LOCATIONS
|
---|
246 | Now converting a few data elements in your existing construction projects.
|
---|
247 | This shouldn't take very long.
|
---|
248 | Now re-indexing
|
---|
249 | Finished at
|
---|
250 | PRLOCAL]
|
---|
251 | Project is locked by another user. Please try later
|
---|
252 | Please enter appropriate Project and Budget Categories for the new Program.
|
---|
253 | MA,MI,MM,NR,
|
---|
254 | The Budget Category has automatically been changed to the default value for the new project category.
|
---|
255 | (The previous value was
|
---|
256 | Previous Progress Note not found.
|
---|
257 | This page is optional since the project category is not NHCU.
|
---|
258 | The NHCU data must be entered since the project category is NHCU.
|
---|
259 | PRINT WHICH PAGES:
|
---|
260 | Print Project Report (10-0051)
|
---|
261 | IOINLOW;IOINHI;IOINORM
|
---|
262 | Print All Project Reports (10-0051)
|
---|
263 | CONSTRUCTION PROJECT PROGRESS REPORT
|
---|
264 | SERVICING FACILITY:
|
---|
265 | FMS #:
|
---|
266 | REPORTING PERIOD:
|
---|
267 | BONUS:
|
---|
268 | EPA REPORTING CATEGORY:
|
---|
269 | NHCU BEDS:
|
---|
270 | AUTHORIZED:
|
---|
271 | CONVERTED FROM:
|
---|
272 | NEW:
|
---|
273 | RENOVATED:
|
---|
274 | CONVERTED:
|
---|
275 | DESIGN:
|
---|
276 | CONSTRUCTION:
|
---|
277 | CONTRACT DATA
|
---|
278 | SUPPLEMENTAL AGREEMENTS
|
---|
279 | An asterisk '*' indicates a change since the last transmission.
|
---|
280 | REVISED/
|
---|
281 | ACTUAL DATE
|
---|
282 | Contract:
|
---|
283 | Add #:
|
---|
284 | Original Award:
|
---|
285 | Ded #:
|
---|
286 | Net
|
---|
287 | Study:
|
---|
288 | Schematics:
|
---|
289 | Site Survey:
|
---|
290 | Design Development:
|
---|
291 | Const. Documents:
|
---|
292 | Site Visits:
|
---|
293 | Const. Period Svcs.:
|
---|
294 | Subtotal:
|
---|
295 | Add #:
|
---|
296 | Original Award:
|
---|
297 | Ded #:
|
---|
298 | Extension (days):
|
---|
299 | Labor (to date):
|
---|
300 | Matrls (to date):
|
---|
301 | TOTAL P&H:
|
---|
302 | Report Actions Due In
|
---|
303 | #################### #################### ####################
|
---|
304 | #################### #################### ####################
|
---|
305 | #################### #################### ####################
|
---|
306 | #################### #################### ####################
|
---|
307 | #################### #################### ####################
|
---|