English	French	Notes	Complete/Exclude
Another user is editing this entry.  Please try again later.			
DEVELOPMENT OF NEW CEMETARY			
.01///DEVELOPMENT OF NEW CEMETERY			
.01///54515/STEAM DISTRIBUTION SYS,PREV MAINT			
.01///55210/LAUNDRY & DRYCLEANING EQUIP,PMI			
.01///55536/NUCLEAR MEDICINE EQUIP,REPAIR			
.01///55537/NUCLEAR MEDICINE EQUIP,REPLACE			
Engineering users are active.  Cannot proceed.			
DON'T SEE YOUR STATION NUMBER. Please check Eng Init Parameters File.			
Must upgrade to Version 6.5 before proceeding.			
One or more WORK ACTIONS don't have pointers to NEW WORK ACTIONS.			
Patch EN*6.5*5 must be fully installed prior to installation			
of Engineering 7.0.			
Installation aborted. Database unchanged.			
Correcting ENG DJ SCREEN 'ENEQNX1'...			
ERROR - Screen ENEQNX1 not found in ENG DJ SCREEN file!			
ERROR - Label MANUFACTURER not found in ENEQNX1 Screen in ENG DJ SCREEN file!			
Correction completed. This routine (ENPAT14) can be deleted.			
Please set DUZ(0)=			
 and re-run this routine			
Moving inappropriately posted PM manhours			
Modifying Data in File #7336.9 (OFM BUDGET CATEGORY)			
ERROR - File 7336.9 Not Found			
MA,MI,MM			
MA,MI,MM,NR			
Modifying Data in File #7336.8 (OFM PROJ CATEGORY)			
ERROR - File 7336.8 Not Found			
Re-Indexing ENG SPACE (#6928) file			
ERROR - 			
PATCH 7*35 PM DELETE			
Deletion of Old Incomplete PM Work Orders			
 old incomplete PM work orders were just deleted.			
  Press RETURN to continue			
Select PROJECT NUMBER: 			
File is use, Please try later!			
Must Support 132 Character Display			
Printing VAF 10-1193			
Hit <RETURN> to Continue; '^' to Quit			
Hit <RETURN> to Continue			
File in use, Please try later!			
Project Applications are not currently supported for Lease projects.			
File in Use, Please try later			
  AREA CAT 			
PRIORITY 			
 PRIORITIZATION SCORING SHEET			
Printing Minor Design/Misc Prioritization Sheet			
Project Title:			
Project #			
TOTAL ESTIMATED:  Construction Cost: 			
Design Cost: 			
Activations FY: 			
Additional FTEE Required:			
Recurring PS $:			
Non-Recurring All Other $:			
Equipment $:			
Travel .007 $:			
Recurring all other $:			
Major/Minor Funded Projects to which Domino			
Title			
Equipment Over $250K:			
Qty:			
Qty: 			
Brief Project Description: 			
1. Cited JCAHO/AALAC/CAP Accreditation Deficiency.			
Page			
Name/Title			
4. Energy Conservation:			
5. Category Bonus (Scope Dependent):			
FACTOR SUBTOTAL			
6. VAMC Priority: [Rank and Submit 			
2 Minor Design projects			
no more than 4 Minor Misc			
VAMC & FACTOR SUBTOTAL			
Region to Complete:			
7. Priority Equipment: High Technology/High Cost [Must be one of Region's			
top 5 priorities on Over $250K nat'l priority list; equipment name/cost should			
be listed above]			
YES = 10			
NO = 0			
8. Region Priority: [Rank and Submit 			
12 Minor Design			
35 Minor Miscellaneous			
Priority:			
Points			
TOTAL SCORE			
Minor Attachment 			
Rev 1/5/93			
Project #: 			
Budget Year of 5-Yr Plan			
Enter a Fiscal Year between 1995 and 2099			
Note: This is the Plan's, not the Project's Budget Year			
This year enables differentiation among current, budget and out year projects			
Enter the 4-digit Budget Year of the Plan			
No Projects on file for this Site			
VAMC: 			
Select Division to be included in report or leave blank for all			
Start with year: 			
:CURRENT YR;			
:BUDGET YR;			
:BUDGET YR+1;			
:BUDGET YR+2;			
:BUDGET YR+3;			
:BUDGET YR+4;FUTURE:FUTURE YEARS			
Enter a 4 digit year from 			
 or FUTURE			
Go to year: 			
:BUDGET YR			
:CURRENT YR			
FUTURE:FUTURE YEARS			
Enter FUTURE			
 or a four digit year from 			
Level of detail: 			
Enter a code (L, S, E, D, or H)			
L (LOWEST)    Prints only project list pages.			
S (SUMMARY)   Prints project list and final summary pages.			
E (EQUIPMENT) Prints equipment page only.			
D (DEFAULT)   Prints project list, final summary,			
                and equipment list pages. Prints detail			
                pages for BUDGET and BUDGET+1 years.			
H (HIGHEST)   Prints project list, final summary,			
                pages for BUDGET through BUDGET+4 years.			
* Must Support 132 Character Display			
Five Year Facility Plan Report			
MI-MISC			
TOTAL COST (Excluding Expedited Leases)			
Project Count			
   LEASE (excludes Expedited) = 			
   MINOR MISC = 			
CURRENT YEAR APPROVED			
FUTURE YEARS			
BUDGET YEAR			
 PROJECT LIST			
PROJ #			
*    C = Construction dollars only    D = Design dollars only			
FIVE YEAR FACILITY PLAN			
PROJECT NUMBER: 			
FACILITY TYPE: 			
PROGRAM: 			
MCPS SCORE: 			
# NEW NHCU BEDS:			
BONUS CATEGORY: 			
# NHCU BEDS RENOVATED:			
AMBULATORY CARE PERCENTAGE: 			
# NHCU BEDS CONVERTED:			
BUDGET CATEGORY: 			
FUNDING YEAR			
ESTIMATED COST (in $000)			
APPROVED COST (in $000)			
LEASE TYPE: 			
PROPOSED LEASE TERM: 			
RENTABLE SQ FT: 			
NET PARKING: 			
AWARD LEASE			
  (Lump Sum)			
RENT STARTS			
  (Annual Rent)			
EXISTING SPACE RENTABLE SQ FT: 			
EXISTING SPACE ANNUAL RENT: 			
ACTIVATIONS:  FISCAL YEAR REQUIRED: 			
(costs in $000)			
ADD'L FTEE REQUIRED:			
EQUIPMENT:			
RECURRING PS:			
RECURRING ALL OTHER:			
NON-RECURRING ALL OTHER:			
TRAVEL .007:			
EQUIPMENT OVER $250K:			
ADD/REPL			
TOTAL COST (in $000)			
none listed			
TOTAL COST			
BUILDINGS: 			
CITED DEFICIENCY: 			
 PROJECT DETAIL			
Note: Equipment not included for projects in 			
current year (			
future years (>			
EQUIPMENT OVER $250K LIST			
FUNDING YR			
EQUIPMENT NAME			
ADD/			
TOT COST			
CONST/RENT			
SHORT DESCRIPTION:			
SHORT JUSTIFICATION:			
ENT(ENYR,			
PLAN TOTAL			
ENB(			
FY FUTURE			
PLAN+FUTURE			
ENC(			
PLAN SUMMARY BY PROGRAMS AND FISCAL YEARS (in $000)			
MINOR MISC			
CONST TOTAL			
LEASE TOTAL			
PLAN and PLAN+FUTURE counts only include split year projects once and may not equal the sum of the year counts.			
Lease column excludes Expedited leases.			
Sorry, You lack a Security Key required for Approval Authority			
Chief Engineer must sign approval before VAMC Director			
Project Number: 			
Program: 			
Do you wish to view a project summary:			
Enter 'Y' to see additional information about this project.			
Project was previously approved by 			
Do you want to change the approval status			
PROJECT APPLICATION			
PROJECT NUMBER			
EXECUTIVE SUMMARY			
***********  COST DATA  ***********			
40. CONSTRUCTION METHOD PLANNED: 			
41. AE $ REQUIRED IN FY: 			
42. CONST $ REQUIRED IN FY: 			
43. NRM COSTS: 			
44. MAJOR/MINOR/MINOR MISC. COSTS: 			
46. TOTAL BSEA COSTS: 			
47. TOTAL BSER COSTS: 			
48. TOTAL MI COSTS: 			
49. TOTAL CONST. COST (LOW BID): 			
54. TOTAL CONST. COST (LOW BID): 			
50. CONST CONTCY % AND $: 			
55. CONST CONTCY % AND $: 			
51. IMPACT COSTS: 			
56. IMPACT COSTS: 			
52. TECHNICAL SERVICES % AND $			
57. TECHNICAL SERVICES % AND $			
53. TOTAL PROJECT COSTS: 			
58. TOTAL PROJECT COSTS: 			
***********  ACTIVATION DATA  ***********			
59. ACTIVATION $ REQUIRED IN FY: 			
66. EQUIP OVER $250K  : 			
EQPMT (OVER $250K)			
60. ADDITIONAL FTEE: 			
67. VAMC SCORE: 			
61. RECURRING PS $ : 			
68. REGION SCORE: 			
62. RECURRING ALL OTHER $ : 			
64. NON-RECURRING ALL OTHER $ : 			
69. TOTAL PROJECT SCORE: 			
70. CHIEF ENGINEERING SVC/DESIGNEE: 			
72. DIRECTOR FACILITY/DESIGNEE: 			
74. REGION PROJECT VALIDATION: 			
VAF 10-1193 REVISED 5/95 p.2			
DETAILED PROJECT DESCRIPTION:			
DETAILED PROJECT JUSTIFICATION:			
IMPACT JUSTIFICATION:			
VAF 10-1193 REVISED 5/95 p.3			
***********  GENERAL DATA  ***********			
1. PROJECT PROGRAM: 			
3. FACILITY PRIORITY: 			
5. PROJECT TITLE: 			
6. PROJECT NUMBER: 			
8. EQUIPMENT OVER   : 			
NUMBER(S)			
10. BUILDING OCCUPANCY: 			
11a. PROJECT CATEGORY: 			
11b. BONUS CATEGORY: 			
11c. SIR RATING: 			
11d. % ENERGY TARGET ACHIEVED: (Region enters)			
12a. BUDGET CATEGORY: 			
12b. EPA CATEGORY: 			
13. NET BED CHANGE: 			
14. LISTED ON 5 YR FACILITY PLAN: 			
15. 5-YR FACILITY PLAN FY: 			
16. NET PARKING CHANGE: 			
17. PROJECT DESCRIPTION:			
18. PROJECT JUSTIFICATION:			
20. FDP UPDATE COMPLETED: 			
* Reserved for Future Use *			
21. DEPARTMENT/SERVICE OR TECHNICAL			
22. FDP CRITICAL			
23. FDP CORRECTIVE			
DEFICIENCIES TO BE ADDRESSED			
ACTION #			
24. PROJECT SCOPE: 			
NSF           GSF			
29.-30. NSF & GSF TOTALS: 			
HISTORICAL: 			
ENVIRONMENTAL: 			
SEISMIC: 			
HAZARDOUS MAT'LS: 			
TRANSPORT: 			
PARKING: 			
IMPACT: 			
Information (if any) moved to Impact Justification on page 3.			
VAF 10-1193 REVISED 5/95 p.1			
PROJECT APPLICATION - SIGN OFF SUMMARY			
PROJECT PROGRAM: 			
FACILITY PRIORITY: 			
TOTAL PROJECT SCORE: 			
EMERGENCY APPLICATION: 			
EQUIPMENT OVER $250K APPLICATION: 			
BUILDING NUMBER(S): 			
BUILDING OCCUPANCY: 			
NET BED CHANGE: 			
NET PARKING CHANGE: 			
LISTED ON 5 YR FACILITY PLAN: 			
5-YR FACILITY PLAN FY: 			
NEW NET SQ. FT.: 			
NEW GROSS SQ. FT.: 			
RENOVATED NET SQ. FT.: 			
RENOVATED GROSS SQ. FT.: 			
####################	####################	####################	
####################	####################	####################	
####################	####################	####################	
####################	####################	####################	
####################	####################	####################	
